Install Solution // Sloped Sites
Sloped Sites
On engineered footings, the pool stands level over a slope that would need major earthworks for a concrete or fibreglass pool.
When it suits
A steep block is where a concrete or fibreglass pool gets expensive. Digging into a slope means cutting, retaining walls and drainage, and the cost climbs with the gradient. A container pool is a self-supporting steel structure, so it can stand level on engineered footings while the ground falls away underneath it.

How we install it
After the site assessment, an engineer designs footings for your soil and slope, and we build them before the pool leaves our Lowood yard. On the day, the finished pool is craned onto the footings and levelled, so the waterline can sit at the height of your deck while the slope below is left largely untouched.
- Site worksEngineered footings, little or no bulk excavation
- ShellSteel, marine-grade coating inside and out
- DeliveryCraned onto your base, usually within a day
- WarrantyWritten 10-year structural warranty on the shell
What to plan for
Crane reach is the deciding factor on steep sites, so we confirm where a crane can stand and how far it must reach before anything is designed. Footings are quoted after the engineering design, because a gentle fall and a steep drop are very different jobs. The pool still needs a compliant barrier, and an elevated pool often needs its access stairs or deck fenced.

Read more in our sloping block guide and crane access guide, or see prices on the price list.
Your Site, Engineered
Could this work on your block?
Every install starts with your site. Configure a pool in minutes, or talk your site through with our team.


